
Company Name: |
Datum |
|
Unit Number: |
72T |
|
Tel: |
0191 516 (6396) |
|
Website: |
||
Email: |
datum@bicne.co.uk | |
Profile: |
Road and Sewer Design External Plot Works Establishing optimum finished floor levels, plot drainage and garden levels, together with associated setting-out information. Adoption Management Coordination of remedial works and liaison with the Local Authority / Water Company to obtain adoption at the earliest opportunity. Flood Risk Assessments Undertaking simple flood studies or project management where a specialist consultant is required to analyse a river or watercourse. Sewer Requisitions Advising on this often complicated process and working with the local Water Company to ensure a cost effective solution. Service Reports Preparing service reports to identify problems, risk hence costs associated with potential sites. These reports can be varied in depth to suit individual clients requirements.
|

